Where Siberian rivers turn into raw power (VIDEO)
Started in the Soviet era, the Bureya HPP was finally completed in 2015 after almost 30 years of construction. The result is a 2,010 MW giant whose reservoir stretches 234 kilometres deep into the Amur wilderness.
@amur_travel